Engine Room Chipmunk

Two weeks on the hard in 3D Boatyard, Key West. We are trying to repair and fit our catamaran Fata Morgana for cruising and off-grid livaboard.

Ivo has been working like crazy from dawn till dusk, me and the kids helping from time to time.

First, he spent a week grinding the hulls, then he took care of the engines.

One morning, he moved in the engine rooms and lived there for many hot days like a chipmunk, emerging on rare occasions to gather food and beer, or to jump from one engine room to the other. Out of compassion, many people in the boatyard suggested we should install a small hammock in one of the compartments of one of the engine rooms, so that he could sleep there and wouldn’t have to come out at night.

For the fibreglass works and repairs we hired Ed, a fibreglass specialist. He turned out to be Ivo’s soul mate  working in a similar fashion, never resting, never stopping, grinding all day, covered in thick white dust. When Ivo and Ed work together, they never talk, but telepathically exchange thoughts: two yogis working in perfect Krishna harmony.

Here are the results of their joint efforts so far:

April 1 to April 17

Repairs&projects already done:

1.  Engines Westerbeke 44 a (there are two engines on a catamaran)

  • cleaned the engine rooms and engines from nasty oils
  • changed all hoses and clamps
  • fixed the alternator
  • changed oil filters and oil

(All the work on the engines has been done by Ivo. After the work was finished, some people in the boatyard who saw the sparkling results, suffered mildly from an engine-room envy.)

2. Stanchions

  • unscrewed all stanchions
  • replaced all stanchion’s aluminium bases with stainless steel bases.

(All the work on the stanchins as been done by Ivo, Maya and Mira helped a bit)

3. Hulls (there are two hulls on a catamaran….)

  • sanded 
  • repaired a few spots with fibreglass
  • repaired starboard bow badly repaired previously

(Ivo, Viktor, and Mira did the sanding, most of it Ivo, Ed did the fibreglass repairs)

4. Keels (guess how many keels there are on a catamaran?)

  • sanded
  • ground
  • still waiting to dry
  • will repair them with six layers of fibreglass

(All work on the keels has been done by Ed)

5. Bimini

  • removed the bimini and frame
  • building a hard-top bimini (in progress)

(Ed is in charge of the hard-top bimini, working together with Ivo. I will publish a separate post entitled The Making of The Hard Top Bimini with pictures of all stages as soon as it is finished.)

Next, we will be painting the hulls, installing a water-maker, and will order foam and make mattresses for two of the three cabins ( there was only one mattress in the boat). We will also be doing many other things, but we can do them in the water, so I think for the boatyard, that’s pretty much it.

Hull after sanding

Hull after sanding

Starboard bow repair in progress.

Starboard bow repair in progress.

Ground keels drying

Ground keels drying

Stainless steel stanchions

Stainless steel stanchions

Sparkling engine and engine room.

Sparkling engine and engine room.

Share